Home About us Products Services Projects News Local news Gallery - Map Contact us
Profile ACHIEVEMENTS Organization chart Activity
Orchids Equipments Fertilizer Fruit
Designing Consultation Agricultural Services Construction And Installation Map Measurement Exploitation and Management Project Management General manufacture and trade
Project Management Business
Irrigation Management News Project Management News Hydro - Meteorological News Environment News Flood & Storm News Local news
Map Photos
FIELD OPERATIONS
Profile
ACHIEVEMENTS
Search
PHOTO GALLERY
bank of east main canal update
n38 6 canal
n25 6 canal
n46 canal
east main canal k41
cau mang n31a
cong trinh thuy loi
STATISTICS
Online: 30 | Hit counter: 1134564
IRRIGATION MANAGEMENT NEWS
The plan for supplying water in Summer Autumn 2011 of  Dau Tieng Reservoir

Base on the Announcement of Ho Chi Minh City Irrigation Management Company, issued on March 10th 2011 about The plan for supplying water in Summer Autumn 2011:

 

1-      From April 1st 2011 to April 15th 2011 the Dau Tieng reservoir  will cut off the water supply for maintenance the structures. From April 15th 2011 and will open water of  East main canal for supplying water in Summer Autumn 2011;

 

2-      The Committee’s communes and Water Using Organizations have to do the following methods:

-        Encourage strenuously the Farmers, Water Using Organizations to maintain the irrigation system in time of cutting off water supply

-        Concentrating to seed at the same time, on schedule, encourage to change crop pattern of dry land area using less water.

-        Saving water, strengthen to store water in fields, pools, field dranage canals for irrigating.

-        Preparing pump-engine to pump for preventing drought

 

Other news
Rising sea, drought threaten drinking water
Irrigation tax exemptions lift farm output
Ho Chi Minh City: The risk for lack of fresh water
SYMBOL PROJECTS
irrigation system in saigon riverside from lang the to song lu project
channel dredging project thay cai an ha
hydraulic works upgrading project an phu phu my hung
dredging projects upgrade channel t38
flood prevention projects and maintenance of irrigation works in 2009
water supply project
Copyright © HO CHI MINH CITY IRRIGATION MANAGEMENT COMPANY
Address: 21 Highway 22 - Tan Phu Trung Commune - Cu Chi District - Ho Chi Minh City , Tel: 8922258 , Email: info@dichvuthuyloi.com.vn
Designed & Developed by EMSVN